Two installs — a dormakaba entrance control at a California airport and an Alvarado multi-lane in Colorado — same shape of problem: we showed up ready to work and the site wasn't ready for us. The real story isn't the install. It's the four days of standing around before the install became possible, and the part of the job nobody quotes for: waiting well.